The Public Utility Commission of Texas has outlined specific procedures for certifying renewable energy credit generators. The certification process involves several key steps, including providing a completed application, submitting a map showing the facility's location and interconnection points, and accurately describing the facility's operation and any fossil fuel usage. The application must also include information about the facility's owner and designated representative, as well as the facility's annual historical output.
Key Takeaways:
- The certification form for renewable energy credit generators must include a map showing the facility's location and interconnection points, as well as a narrative describing the facility's operation and any fossil fuel usage.
- The application must also include information about the facility's owner and designated representative, including their name, address, and phone number.
- The facility's annual historical output must be provided, including the date of commercial operation and the total rated nameplate capacity.
- The owner of the facility must provide the annual historical output of the facility from the start of commercial operations up to the date of filing the application.
- The certification process requires the owner to inform the Project Administrator of any change that renders the information contained in the certification obsolete, and to provide notification in writing no later than 30 days after the change is discovered.
Statistics:
- The certification process requires the submission of a map showing the facility's location and interconnection points (Item 2).
- The application must include information about the facility's owner and designated representative, including their name, address, and phone number (Items 3-5).
- The facility's annual historical output must be provided, including the date of commercial operation and the total rated nameplate capacity (Item 11).
- The owner of the facility must provide the annual historical output of the facility from the start of commercial operations up to the date of filing the application (Item 14).
Sources:
File No. 58197, "Procedure for Certifying Renewable Energy Credit Generators", Public Utility Commission of Texas, Filed Date - 2025-06-05 02:54:02 PM.