Certification Requirements for Renewable Energy Credit Generators in Texas
The Public Utility Commission of Texas has outlined specific procedures for certifying renewable energy credit generators. The certification process involves providing detailed information about the facility, including its location, ownership, and generation technology. The application must also include a narrative explanation of how the output of the facility is physically metered and verified in Texas.
Key Takeaways:
- A completed application for certification must include a completed Certification Form for Renewable Energy Credit Generators, a map showing the facility's location, and a narrative explanation of how the output is physically metered and verified in Texas.
- The facility's owner must be based in Texas, and the owner's designated representative and alternate representative must also be based in Texas.
- The certification process requires an update of information filed with the Commission any time the capacity of the facility changes.
- The owner of the facility must provide the annual historical output of the facility from the start of commercial operations up to the date of filing the application.
- Eligible units for renewable energy credits are those that are not fossil fuel units that have been repowered to use a renewable fuel, were not developed as part of an emissions reduction project, and are not included in the rates of any utility or are not capacity that was in operation before Sept. 1, 1999 unless the nameplate capacity is less than 2 MW.
- The owner of the facility must provide a narrative specifying the shutdown date, restart date, previous rated nameplate capacity, and new rated nameplate capacity for previously existing renewable energy units that were upgraded and repowered after Sept. 1, 1999.
- The facility's owner must provide documentation to support any change of status, including any portion of the unit's above-market costs included in the rates of any utility.
Statistics:
- The certification process requires an update of information filed with the commission any time the capacity of the facility changes.
- The owner of the facility must provide the annual historical output of the facility from the start of commercial operations up to the date of filing the application.
- Eligible units for renewable energy credits are those that are not fossil fuel units that have been repowered to use a renewable fuel, were not developed as part of an emissions reduction project, and are not included in the rates of any utility or are not capacity that was in operation before Sept. 1, 1999 unless the nameplate capacity is less than 2 MW.
- The facility's owner must provide a narrative specifying the shutdown date, restart date, previous rated nameplate capacity, and new rated nameplate capacity for previously existing renewable energy units that were upgraded and repowered after Sept. 1, 1999.
Sources:
- Public Utility Commission of Texas. (2025, June 5). Procedure for Certifying Renewable Energy Credit Generators. Control Number - 58197, Item Number - 3.