Critical Mineral Resources PLC Shares Soar on Agadir Melloul Project Expansion
Critical Mineral Resources PLC (LSE:CMRS) shares have experienced a significant surge, with a 40% increase in Wednesday's trade. This rise is attributed to the company's plans for the Agadir Melloul sedimentary copper project in central Morocco. The project's expansion has resulted in the acquisition of three additional permits, giving the company a "dominant position in the Agadir Melloul district."
Chief executive Charlie Long expressed his enthusiasm for the development, stating that the company has moved from being a rock-kicking explorer to a project developer with a significant asset. The exploration company is earning into a 60% interest in the project, which has seen over 50 drill pads prepared for the upcoming drill campaign.
Initial exploration targets include 150,000 to 200,000 tonnes of contained copper at a 1.2% copper equivalent. Metallurgical test data indicates copper and silver recoveries of 80% and 61%, respectively, with a copper concentrate of 26%. The existing sampling data has helped to underpin the initial mine project, including a 750 to 1,000 tonnes per day flotation plant, thus derisking the investment.
Long added that the potential for a much larger discovery provides a "very exciting and potentially very high return investment case for both current and future shareholders." The company promises that assay results will be available soon after drilling begins, with plans to maintain "newsflow" in the months and years to come.
Key Takeaways:
- Critical Mineral Resources PLC (LSE:CMRS) shares surged 40% in Wednesday's trade due to the Agadir Melloul project expansion.
- The company has acquired three additional permits, giving it a "dominant position in the Agadir Melloul district."
- Initial exploration targets for the project include 150,000 to 200,000 tonnes of contained copper at 1.2% copper equivalent.
- The project has seen over 50 drill pads prepared for the upcoming drill campaign, with the company earning a 60% interest.
- Metallurgical test data indicates copper and silver recoveries of 80% and 61%, respectively, with a 26% copper concentrate.
- The existing sampling data has underpinned the initial mine project, including a 750 to 1,000 tonnes per day flotation plant.
Statistics:
- Initial exploration targets: 150,000 to 200,000 tonnes of contained copper.
- Copper equivalent: 1.2%.
- Copper recoveries: 80%.
- Silver recoveries: 61%.
- Copper concentrate: 26%.
Sources:
- "CMR Steps Up Exploration at Agadir Melloul," Critical Mineral Resources PLC.