Environmental Assessment for the White River Hydroelectric Project

The White River Hydroelectric Project, located on the White River in Ashland and Bayfield Counties, Wisconsin, has filed an application with the Federal Energy Regulatory Commission (FERC) for a subsequent license to continue operating and maintaining the project. The project, owned by Northern States Power Company, has a generating capacity of 1,200 kilowatts (kW) and provides a source of hydroelectric power to the regional electric grid.

Key Takeaways:

  • The project, located on the White River, has a generating capacity of 1,200 kW and provides hydroelectric power to the regional grid.
  • The purpose of the project is to provide a source of hydroelectric power, and FERC must determine whether to issue a license to Northern States Power Company.
  • The Commission must consider factors such as energy conservation, protection of fish and wildlife resources, recreational opportunities, and preservation of environmental quality in its decision.
  • The project's license would allow Northern States to continue generating electricity for the term of the license, making renewable energy available to the regional grid.
  • The project's staff alternative involves modifying the existing project facilities, including upgrading the spillway, increasing the turbine flow rate, and implementing fish passage measures.
  • Fish species, including Class II trout, were identified in the White River during a fisheries survey conducted in 2022.
  • The project's environmental impact statement considers the effects on aquatic resources, terrestrial resources, threatened and endangered species, land use, recreation, and aesthetics.

Statistics:

  • The project's generating capacity is 1,200 kW.
  • The project is located on the White River in Ashland and Bayfield Counties, Wisconsin.
  • The project's staff alternative involves modifying the existing project facilities.
  • Fish species, including Class II trout, were identified in the White River during a fisheries survey conducted in 2022.
  • The project's mass flow rate is approximately 4.3 cubic meters per second (CFS).
  • The project's dissolved oxygen levels are maintained within the required ranges.

Sources:

  • Federal Energy Regulatory Commission (FERC). (2025). Environmental Assessment for Hydroelectric License of the White River Hydroelectric Project. Document Accession #: 20250717-3010.
  • Northern States Power Company. (2023). Application for Subsequent License for the White River Hydroelectric Project. FERC Project No. 2444-042.