Federal Energy Regulatory Commission Approves Capacity Assignment for ConocoPhillips Company

The Federal Energy Regulatory Commission has issued a delegated order, dated July 15, 2025, approving the permanent assignment of capacity from Marathon Oil Permian LLC to ConocoPhillips Company, as requested by Double E Pipeline, LLC. This action was taken after Double E Pipeline, LLC filed tariff records on June 25, 2025, and no protests or adverse comments were filed. The order acknowledges the waiver of the Commission's 30-day notice requirement and grants notices of intervention, timely-filed motions to intervene, and unopposed motions to intervene out-of-time.

Key Takeaways:

  • The Federal Energy Regulatory Commission has issued a delegated order approving the permanent assignment of capacity from Marathon Oil Permian LLC to ConocoPhillips Company.
  • Double E Pipeline, LLC filed tariff records on June 25, 2025, to reflect the capacity assignment, which was deemed acceptable by the Commission.
  • The Commission waived its 30-day notice requirement due to the lack of protests or adverse comments.
  • ConocoPhillips Company will now have control over the assigned capacity, as reflected in the approved tariff records.
  • The action does not constitute approval of the referenced filing or any rate, charge, classification, or rule affecting such rate or service contained in the applicant's tariff.
  • Double E Pipeline, LLC's filing was publicly noticed, and no adverse comments were filed.
  • Marsha K. Palazzi, Director, Division of Pipeline Regulation, issued the order.

Statistics:

  • The Commission issued the delegated order on July 15, 2025.
  • Double E Pipeline, LLC filed the tariff records on June 25, 2025.
  • The capacity assignment affects ConocoPhillips Company, Marathon Oil Permian LLC, and Double E Pipeline, LLC.
  • The approved tariff records are effective July 1, 2025.
  • The filing was publicly noticed, with no adverse comments submitted.

Sources:

  • Federal Energy Regulatory Commission. (2025, July 15). Double E Pipeline, LLC Docket No. RP25-970-000.
  • Federal Energy Regulatory Commission. (2025, July 15). Documents. Document Accession #: 20250715-3012.