Harbin Emphasizes Flood Prevention and Preparedness in Wuchang City

Provincial Party Secretary Xu Qin led an inspection and supervision team to the Longfengshan Reservoir and Niuniu River embankment flood damage repair project in Wuchang City, Harbin City to inspect and supervise flood prevention and preparedness work. The team stressed the need to adhere to the people and life first, establish bottom-line thinking and extreme thinking, and do a solid job in flood prevention and preparedness. Xu Qin emphasized the importance of making good use of information and intelligent technology, strengthening automatic monitoring of rainfall and water conditions, and improving the scientific dispatching system.

Key Takeaways:

  • Provincial Party Secretary Xu Qin emphasized the need to conscientiously implement General Secretary Xi Jinping's important expositions on disaster prevention, mitigation, and relief, and fully implement the national flood prevention work deployment.
  • The team inspected the construction of the reservoir flood control capacity improvement project at Longfengshan Reservoir, emphasizing the need to speed up the project completion and acceptance, ensure the quality of the project, and improve the reservoir function.
  • Xu Qin learned about the operation of the reservoir digital management system, emphasizing the need to strengthen the automatic monitoring of rainfall and water conditions, dynamically update hydrological data, and improve the scientific dispatching system.
  • The team checked the dangerous and weak sections of the embankment at the Niuhe River flood damage repair project, stressing the need to repair and reinforce them in a timely manner and ensure the safe operation of flood control projects during the flood season.
  • Xu Qin emphasized that the main flood season is from July to August, and all localities and departments must adhere to the political position, conscientiously implement the important instructions of General Secretary Xi Jinping on flood control and drought relief.
  • The team stressed the need to consolidate the foundation of flood control, scientifically formulate the "15th Five-Year Plan" water security guarantee plan for Longjiang, strengthen the management of small and medium-sized river systems, and accelerate the construction of reservoir projects and risk removal and reinforcement.
  • Xu Qin also visited the Jinhe Modern Agricultural Industrial Park in Wuchang City, learning about customized agriculture and the importance of enhancing the value of branded agriculture to drive farmers to increase their income and become rich.

Statistics:

  • The 15th Five-Year Plan water security guarantee plan for Longjiang aims to improve the flood control capacity of the entire basin and the food security guarantee capacity.
  • The plan emphasizes the need to accelerate the construction of reservoir projects and risk removal and reinforcement, enhance the functions of flood storage and detention areas, and improve the basin flood control and disaster reduction and agricultural irrigation engineering system.
  • The provincial team stressed the need to strengthen information sharing and coordination among meteorological, hydrological, and emergency departments, keep abreast of changes in rainfall and water conditions, accurately monitor and warn of extreme weather and major disasters, and pre-position emergency materials.

Sources:

  • https://www.hlj.gov.cn/hlj/c107856/202507/c00_31859547.shtml