Hsinchu City Government Ensures Safety of Landmark Bridge through Regular Inspections and Improvements
Hsinchu City Government in Taiwan has been prioritizing bridge safety management by commissioning regular inspections of bridges across the city. A recent inspection report highlighted the need for urgent improvements on the historic "Harp Bridge" due to rusted cables and bolts caused by sea breezes and salt erosion. Acting Mayor Chiu Chen-yuan has instructed relevant departments to carry out special repairs and maintenance based on inspection data, ensuring the long-term stability and safety of the bridge. The city government's rigorous inspection standards and professional improvement engineering technology aim to create a reliable transportation environment and enhance local development potential.
Key Takeaways:
- The Hsinchu City Government prioritizes bridge safety management through regular inspections every year, with a professional engineering consulting team conducting assessments.
- The Harp Bridge, a landmark in Xiangshan District, has been identified as a potential structural risk due to rusted cables and bolts caused by sea breezes and salt erosion.
- Acting Mayor Chiu Chen-yuan has instructed relevant departments to initiate improvements and carry out special repairs based on inspection data, ensuring the long-term stability of the bridge.
- The city government's improvement project focuses on replacing aging steel cables and bolts with high-strength materials, strengthening the bridge structure, and extending its service life through improved painting techniques.
- The project will involve closing part of the bridge deck in stages during construction, with alternative routes and traffic guidance provided to minimize inconvenience to tourists and residents.
Statistics:
- The city government expects to complete the contracting process for the improvement project in the second half of 2023 (114).
- The Public Works Department has completed the design phase planning for the project.
- The bridge's aging steel cables and bolts will be replaced with high-strength materials, while the bridge structure will be strengthened to ensure safety and extend the bridge's service life.