The Iowa Utilities Commission (IUC) has inspected the Hampton to Sheffield Electric Transmission Line Reconstruction in Franklin County, Iowa, and found that Corn Belt Power Cooperative (Corn Belt) is likely in violation of IUC rules and regulations. The reconstruction, completed in February 2025, was inspected by IUC staff on March 10, 2025, to ensure compliance with safety standards. However, the inspection revealed probable violations, which Corn Belt must address within 30 days to avoid a contested case proceeding.

Key Takeaways:

  • The Iowa Utilities Commission (IUC) inspected the Hampton to Sheffield Electric Transmission Line Reconstruction in Franklin County, Iowa, on March 10, 2025.
  • IUC staff found probable violations of IUC rules and regulations in the reconstruction, completed by Corn Belt Power Cooperative (Corn Belt) in February 2025.
  • Corn Belt is required to provide a description of corrective actions taken or to be taken for each probable violation, along with visual documentation, within 30 days.
  • The probable violations must be addressed satisfactorily, and if Corn Belt disagrees, supporting documentation must be provided.
  • Failure to reach an agreement may lead to a contested case proceeding.

Statistics:

  • 12.96 miles: The length of the Hampton to Sheffield Electric Transmission Line Reconstruction in Franklin County, Iowa.
  • 2/3/2025: The date Sullivan & Ward, P.C. filed with the IUC a notice of completion of line reconstruction on behalf of Corn Belt.
  • 3/10/2025: The date IUC staff inspected the facilities after reconstruction completed to determine Corn Belt compliance with safety rules and regulations.
  • 30 days: The timeframe for Corn Belt to respond to the IUC's letter with the required information.

Sources:

  • Dennis Puckett Attorney Sullivan & Ward, P.C.