The Pacific Gas and Electric Company (PG&E) has submitted a document to the Federal Energy Regulatory Commission (FERC) addressing concerns related to the probable maximum flood study (PMFS) for the Wise Forebay Dam, part of the Drum-Spaulding Hydroelectric Project. The company completed its efforts to address FERC's Comment 4, a component of the PMFS, and submitted its original plan and schedule on October 30, 2023. A recent update was provided on April 16, 2025, with a partial summary and conclusion of PG&E's efforts enclosed with the letter. A 2025 flood stability analysis, prepared by PG&E and dated March 25, 2025, is also provided.
Key Takeaways:
- PG&E submitted a document to FERC addressing concerns on the probable maximum flood study for the Wise Forebay Dam.
- The company completed its efforts to address FERC's Comment 4, with the original plan and schedule submitted on October 30, 2023.
- A recent update was provided on April 16, 2025, with a partial summary and conclusion of PG&E's efforts enclosed with the letter.
- A 2025 flood stability analysis, prepared by PG&E and dated March 25, 2025, is included in the submission.
- PG&E believes Comment 4 has been partially addressed based on the information enclosed with the letter.
- The company has made efforts to address technical questions through Autumn Eberhardt, dam safety engineer, and general questions through Jackie Pope, license coordinator.
Statistics:
- The submission was made to FERC on [no specific date mentioned].
- The original plan and schedule were submitted on October 30, 2023.
- A recent update was provided on April 16, 2025.
- The 2025 flood stability analysis is dated March 25, 2025.
- The Wise Forebay Dam is part of the Drum-Spaulding Hydroelectric Project (FERC No. 2310).