Potomac Electric Power Company's 5-Day Manhole Event Report for May 28, 2025 Incident
On May 28, 2025, Potomac Electric Power Company experienced a manhole event at 9th and E Street, SE in Washington, D.C. The incident involved a smoking manhole due to 3-phase secondary mains burning, affecting 121 customers and resulting in a 9-hour and 47-minute outage. This report details the events leading up to and including the incident, as well as the repairs made to restore service.
Key Takeaways:
- The incident occurred on May 28, 2025, at 1506 hours, with reports of a smoking manhole.
- Upon arrival, UG Crews found a displaced solid manhole cover with smoke due to 3-phase secondary mains burning.
- Repairs were completed on May 29, 2025, at 0053 hours, with the primary switching to change out 150E fuses.
- The manhole event affected 121 customers and lasted for 9 hours and 47 minutes.
- The classification of the event was a "smoking manhole" due to a displaced solid manhole cover.
- The incident was reported to the OCC within an hour, and a 5-day manhole event report was submitted to the Commission.
- The report was certified by Dennis P. Jamouneau, Assistant General Counsel of Potomac Electric Power Company, on June 3, 2025.
- The incident was served to all parties in Formal Case No. PEPMIR by electronic mail on June 3, 2025.
Statistics:
- 121 customers were affected by the manhole event.
- The outage lasted for 9 hours and 47 minutes.
- The incident occurred at 9th and E Street, SE in Washington, D.C.
- Repairs began at 1506 on May 28, 2025, and were completed at 0053 on May 29, 2025.
Sources:
- PEPMIR - Manhole Incident Report (June 3, 2025)
- Re: PEPMIR - Manhole Incident Report (sent to Public Service Commission of the District of Columbia on June 3, 2025)