Public Utility District Submits Updated Dam Safety Program Review for Wells Hydroelectric Project

The Public Utility District No. 1 of Douglas County, Washington has submitted an updated review of the Owner's Dam Safety Program (ODSP) for the Wells Hydroelectric Project to the Federal Energy Regulatory Commission, Division of Dam Safety and Inspections, Portland Regional Office. The review is effective as of October 31, 2025, and is considered Critical Energy Infrastructure Information (CEII). The filing serves as the public notification of this update, which the District considers essential for ensuring the safe operation of the Wells Hydroelectric Project.

Key Takeaways:

  • The Public Utility District No. 1 of Douglas County, Washington has submitted an updated review of the Owner's Dam Safety Program (ODSP) for the Wells Hydroelectric Project to the Federal Energy Regulatory Commission (FERC).
  • The review is effective as of October 31, 2025, and is considered Critical Energy Infrastructure Information (CEII).
  • The updated ODSP is a critical aspect of ensuring the safe operation of the Wells Hydroelectric Project, which is a vital component of the regional energy infrastructure.
  • The District's ODSP update includes comprehensive reviews and assessments of the dam's safety features, maintenance practices, and emergency management procedures.
  • The updated ODSP was developed in collaboration with multiple stakeholders, including Jacobs, Schnabel, and Douglas County PUD personnel.
  • The District has designated Chief Dam Safety Engineer David Hewitt, PE as the primary point of contact for any questions or concerns related to the updated ODSP.

Statistics:

  • The Wells Hydroelectric Project is a hydroelectric dam located in Douglas County, Washington.
  • The project has a generating capacity of [insert generating capacity].
  • The project's annual energy production is [insert annual energy production].
  • The updated ODSP is a critical component of the project's safety management plan, which includes regular inspections, maintenances, and emergency response planning.
  • The project employs a dedicated team of professionals, including dam safety engineers, maintenance personnel, and emergency response specialists.

Sources:

  • Public Utility District No. 1 of Douglas County, Washington (2025). "Annual Owner's Dam Safety Program Review for the Wells Hydroelectric Project."
  • Federal Energy Regulatory Commission (FERC) (n.d.). "Owner's Dam Safety Program (ODSP) Filing for Wells Hydroelectric Project."