Regional Governor and Minister of Housing Inaugurate Infrastructure Projects in San Martn Region

The regional governor of San Martn, Pedro Bogarn Vargas, participated in a series of activities carried out in the region by the Minister of Housing, Construction and Sanitation, Geiner Alvarado Lpez. The events included the inauguration of various infrastructure projects in several districts, including Soritor, Nueva Cajamarca, Yuracyacu, San Antonio de Cumbaza, and Tarapoto. The investments made by the Executive in the Soritor district included the installation of a potable water and sanitation system in the Villa Hermosa town center.

Key Takeaways:

  • The regional governor, Pedro Bogarn Vargas, participated in the activities carried out by the Minister of Housing, Construction and Sanitation, Geiner Alvarado Lpez, in the San Martn region.
  • The investments made by the Executive in the Soritor district included the installation of a potable water and sanitation system in the Villa Hermosa town center.
  • The regional president, Pedro Bogarn Vargas, saluted the execution of the work in Soritor and other localities such as Agua Azul, Jorge Chvez, La Collpa, Miraflores, Nuevo Oriente, Tpac Amaru, and Lbano.
  • In the province of Rioja, the regional governor participated in the official activities carried out by the Housing Minister, who supervised the progress of the wastewater treatment plant in Nueva Cajamarca.
  • The district of Yuracyacu delivered a multipurpose sports slab, urban equipment that was in charge of the Comprehensive Neighborhood Improvement Program (PMIB) of the Ministry of Housing, Construction and Sanitation (MCVS).
  • The works in the district of San Antonio de Cumbaza included the inauguration of the La Paz pedestrian mall and the improvement of the Emilio San Martn and Miguel Grau shreds.
  • The investment amount for the inauguration of the La Paz pedestrian mall was 65,462 soles, and the improvement of the Emilio San Martn and Miguel Grau shreds required 5,044,998 soles.
  • The work to improve the vehicular traffic service of the main urban roads in the town of San Pedro de Cumbaza, a town center located in the district of the same name, was inaugurated, with an investment amount of 5,886,753 soles.
  • In Tarapoto, Minister Alvarado together with the first regional authority participated in the inauguration of the Cuzco pedestrian and vehicular bridge, located in the Banda de Shilcayo district.
  • The investment amount for the construction of this bridge was 6,403,715 soles.

Statistics:

  • The investment amount for the construction of the Cuzco pedestrian and vehicular bridge in Tarapoto was 6,403,715 soles.
  • The population that will benefit from the Cuzco pedestrian and vehicular bridge is approximately 62,000 inhabitants.
  • The investment amount for the inauguration of the La Paz pedestrian mall in San Antonio de Cumbaza was 65,462 soles.
  • The improvement of the Emilio San Martn and Miguel Grau shreds in San Antonio de Cumbaza required an outlay of 5,044,998 soles.
  • The work to improve the vehicular traffic service of the main urban roads in San Pedro de Cumbaza had an investment amount of 5,886,753 soles.

Sources:

  • Al Bawaba (Albawaba.com)
  • SyndiGate Media Inc. (Syndigate.info)