Review of the Draft Environmental Assessment for the McGuire Nuclear Station Independent Spent Fuel Storage Installation Decommissioning Funding Plan
The United States Nuclear Regulatory Commission (NRC) has issued a document for the review of the draft environmental assessment for the McGuire Nuclear Station Independent Spent Fuel Storage Installation (ISFSI) decommissioning funding plan. The document outlines the NRC's review process and the necessary steps for Duke Energy Carolinas, LLC to demonstrate financial assurance for the decommissioning of the ISFSI. The NRC must determine whether Duke's decommissioning funding plan (DFP) contains the required information and provides reasonable assurance that funds will be available for the decommissioning process.
Key Takeaways:
- The NRC is reviewing Duke Energy Carolinas, LLC's decommissioning funding plan (DFP) for the McGuire Nuclear Station Independent Spent Fuel Storage Installation (ISFSI) to ensure it meets the requirements of 10 CFR 72.30.
- The NRC requires licensees to submit a DFP for review and approval, demonstrating financial assurance for the decommissioning of the ISFSI.
- The NRC has prepared a draft environmental assessment (EA) for the proposed action, which is publicly available in the NRC's Agencywide Documents Access and Management System (ADAMS).
- The public has 30 days to comment on the draft EA, with comments submitted to the NRC's Spent Fuel Licensing Branch.
- Duke Energy Carolinas, LLC must demonstrate financial assurance that funds will be available for the decommissioning process.
- The NRC will consider the public's comments and revise the EA as necessary before its final issuance and publication.
Statistics:
- The McGuire Nuclear Station Independent Spent Fuel Storage Installation (ISFSI) is located in Huntersville, North Carolina.
- The decommissioning funding plan (DFP) submitted by Duke Energy Carolinas, LLC is available in the NRC's Agencywide Documents Access and Management System (ADAMS) under accession number ML12353A033.
- The NRC's review process for the DFP requires that Duke demonstrate financial assurance that funds will be available for the decommissioning process.
- The public has 30 days to comment on the draft environmental assessment (EA).
Sources:
- Document: PRE-DECISIONAL INFORMATION. THIS INFORMATION IS LIMITED TO USE BY THE NORTH CAROLINA DEPARTMENT OF HEALTH AND HUMAN SERVICES.
- Document: G:SFST\72.30 Decommissioning Funding Plans\Duke\ McGuire DFP Consultation Letter to State.docx
- Document: G:SFST\72.30 Decommissioning Funding Plans\ Duke \ McGuire Draft EA for Consultation.docx
- ADAMS P8 Accession No.: ML15224A808
- Letter: ML15225A810
- Enclosure: ML15224A813