Vermont Public Utility Commission Approves 14.4 kW Solar Net-Metered Electric Power System
The Vermont Public Utility Commission has resolved the interconnection issue for a proposed 14.4 kW solar net-metered electric power system in Bristol, Vermont. The system, submitted by Firehouse Apartments Limited Partnership, will interconnect with Green Mountain Power Corporation's grid. The Commission deemed a Certificate of Public Good ("CPG") issued for the system, which must be commissioned within one year.
Key Takeaways:
- The Firehouse Apartments Limited Partnership submitted an application for a 34.6 kW roof-mounted solar net-metering system on August 19, 2022.
- Green Mountain Power Corporation raised concerns about the proposed interconnection, stating that the system could not export to the grid during daylight hours unless downsized to 15 kW or less.
- The Applicant responded by intending to downsize the system to 15 kW or less to interconnect with no export restrictions.
- The Applicant later filed a notice of a proposed amendment to reduce the system's capacity to 14.4 kW.
- No comments were filed regarding the amended proposal, and the Applicant paid the required modification fee on December 5, 2022.
- The Commission determined that the interconnection issue was resolved when the proposed capacity of the amended system was reduced below 15 kW.
- The Amended Project must be commissioned within one year of the date of this Order.
- The Applicant is authorized to commence installation of the Amended Project, subject to the requirements discussed above.
Statistics:
- The original proposed system capacity was 34.6 kW.
- The system was downsized to 15 kW or less to address interconnection concerns.
- The system was further reduced to 14.4 kW in the amended proposal.
- The Amended Project must be commissioned within one year of the date of this Order.
Sources:
- LEVEL 1 - STATE OF VERMONT PUBLIC UTILITY COMMISSION; Case No. 22-3429-NMR
- LEVEL 1 - STATE OF VERMONT PUBLIC UTILITY COMMISSION; 12/08/2022
- LEVEL 2 - STATE OF VERMONT PUBLIC UTILITY COMMISSION; 12/08/2022; ORDER RESOLVING INTERCONNECTION ISSUE AND FINDING CERTIFICATE OF PUBLIC GOOD