Vermont Public Utility Commission Approves Allocation of Sheffield Highgate Export Interface Mitigation Fee

The Vermont Public Utility Commission ("Commission") has approved the proposed allocation of the Sheffield Highgate Export Interface ("SHEI") mitigation fee, totaling $10,914.00, to mitigate negative impacts caused by the facility's construction in the SHEI. The Commission's decision follows a petition filed by Vermont Electric Cooperative, Inc. ("VEC") for approval of the proposed allocation among affected utilities.

The approved allocation is as follows: GMP (Green Mountain Power Corporation) will receive 60.7% ($6,624), WEC (Washington Electric Cooperative) will receive 3.7% ($401), VEC will receive 28.7% ($3,136), and the remaining 6.9% ($753) will be distributed equitably among municipal utilities based on their pro rata share of electric sales or load.

Key Takeaways:

  • The total SHEI mitigation fee is $10,914.00, paid by Vermont Electric Cooperative, Inc. (VEC) on January 20, 2023.
  • The allocation percentages are: GMP (60.7%), WEC (3.7%), VEC (28.7%), and municipal utilities (6.9%).
  • The approved allocation is consistent with the allocation methodology approved in Case Nos. 17-2869-NMP, 18-0107-NMP, 18-0138-NMP, and 18-2168-NMP.
  • The municipal utilities will receive $753.00, which will be distributed equitably among them based on their pro rata share of electric sales or load.
  • The Commission conditioned its approval on the municipal utility payment being distributed equitably among the municipal utilities.
  • The proposed allocation has been approved, similar to previous cases, without specifying how the amount allocated to municipal utilities would be distributed among them.

Statistics:

  • The total SHEI mitigation fee is: $10,914.00
  • The allocation percentages are: GMP (60.7%), WEC (3.7%), VEC (28.7%), and municipal utilities (6.9%)
  • The municipal utilities will receive: $753.00
  • The approved allocation is consistent with previous cases: Case Nos. 17-2869-NMP, 18-0107-NMP, 18-0138-NMP, and 18-2168-NMP

Sources:

  • State of Vermont Public Utility Commission, Order No. 23-0210-PET (February 17, 2023)
  • VEC Letter, dated January 23, 2023 ("VEC Letter")
  • GMP Letter, dated February 8, 2023 ("GMP Letter")
  • Case Nos. 17-2869-NMP, 18-0107-NMP, 18-0138-NMP, and 18-2168-NMP, Order of 2/9/22