Scheduled Power Outages in Gehun Kheda

Residents of various areas in Gehun Kheda can expect power disruptions on Thursday, June 5th, as the electricity department undertakes essential maintenance, departmental, and construction works. The planned shutdowns aim to improve the reliability and safety of the power supply infrastructure. According to the electricity department, these disruptions are necessary for critical maintenance activities, including "Isolator Hot Point Attend work," routine maintenance work, and departmental construction work.

Key Takeaways:

  • Residents of Vandana Homes, Anshul Vihar, Inayatpur, Unihomes Colony, and Imaliya Amrawad will experience a power cut from 6 am to 6:30 pm due to "Isolator Hot Point Attend work."
  • Power supply to BDA Colony, LIG, MIG, HIG, Spring Valley, Katara, Golden Sagar Palm, and their vicinities will be suspended from 9:00 AM to 2:00 PM for routine "Maintenance work."
  • Narmada, Sanskar Colony, Fine Avenue, and Ankit Parishar will be without power from 9:30 AM to 2:30 PM for a significant maintenance operation.
  • Simultaneously, power will be off for "Maintenance work" in Nehru Nagar, DRP Line, Sabri Nagar, and nearby areas from 10:00 AM to 2:00 PM.
  • A separate maintenance activity will affect Bhenkhedi, Akash Garden, Mandi Bairagarh, Sehore Naka, Nagar Nigam, Santji Kutiya, Machhali Bazar, and Chanchal Chouraha, and their surrounding areas, during the same 10:00 AM to 2:00 PM window.
  • Several areas will face shorter, more targeted disruptions for departmental work, including Akrity Green Neev, IBD Royal, and adjacent areas, and Leela Atulyam, Life Style Blue, Mahindra Ample, Rudraksh, Shiva Royal Park Colony, and their nearest areas.
  • For Misrod Phase, Salaiya, Gharonda BDA Colony, and their nearest areas, residents will experience two brief power cuts for "Departmental Construction Work Jumper Open and Closing."
  • Magnum Campus and its nearest areas will face a power cut from 12:00 Noon to 2:00 PM for "Departmental Work."

Statistics:

  • 14 areas will experience a power cut from 6 am to 6:30 pm on Thursday, June 5th.
  • 5 areas will be without power from 9:00 AM to 2:00 PM for routine "Maintenance work."
  • 3 areas will be affected by a significant maintenance operation from 9:30 AM to 2:30 PM.
  • 4 areas will face a power cut from 10:00 AM to 2:00 PM for "Maintenance work."
  • 2 areas will experience a brief power cut from 11:00 AM to 11:30 AM for "Departmental Construction Work Jumper Open and Closing."
  • 1 area will face a power cut from 12:30 PM to 1:00 PM for "Departmental Construction Work Jumper Open and Closing."
  • 1 area will be without power from 12:00 Noon to 2:00 PM for "Departmental Work."

Sources:

  • The Hitavada, June 5th, 2025
  • Contify.com