Arunachal Pradesh Witnesses Historic Transformation in Connectivity and Infrastructure Development

Arunachal Pradesh is witnessing a major transformation in connectivity and infrastructure development, with the state recording unprecedented milestones in road and bridge construction under Chief Minister Pema Khandu's Pema 3.0 Year of Reforms and Growth initiative. The state has seen a 251 percent increase in rural roads and the construction of 3,750 km of national highways, reflecting the government's strong focus on inclusive growth through better connectivity. The state is scripting a new chapter in connectivity, with the Centre sanctioning over Rs 55,000 crore for the construction of Frontier Highways, which are expected to boost inter-district connectivity, border area development, and tourism potential in the frontier regions of Arunachal.

Key Takeaways:

  • Arunachal Pradesh has recorded a 251 percent increase in rural roads and built 3,750 km of national highways under Chief Minister Pema Khandu's Pema 3.0 Year of Reforms and Growth initiative.
  • The Centre has sanctioned over Rs 55,000 crore for the construction of Frontier Highways, which are expected to boost inter-district connectivity, border area development, and tourism potential in the frontier regions of Arunachal.
  • 12.9 percent of Arunachal Pradesh's budget is allocated to roads and bridges, the highest in India.
  • The pace of road construction has increased ninefold over recent years, resulting in the completion of several key projects under the Chief Minister's Comprehensive State Road Development Plan (CMCSRDP).
  • So far, Rs 965.99 crore has been sanctioned under the CMCSRDP, and 393.57 km of roads have been completed, improving access to far-flung areas.
  • 270 bridges have been constructed across the state during Chief Minister Khandu's tenure, connecting remote valleys and ensuring all-weather accessibility for communities and local economies.

Statistics:

  • 251 percent increase in rural roads under Chief Minister Pema Khandu's Pema 3.0 Year of Reforms and Growth initiative
  • 3,750 km of national highways constructed
  • Rs 55,000 crore sanctioned by the Centre for the construction of Frontier Highways
  • 12.9 percent of Arunachal Pradesh's budget allocated to roads and bridges
  • Ninefold increase in the pace of road construction under the Chief Minister's Comprehensive State Road Development Plan (CMCSRDP)
  • Rs 965.99 crore sanctioned under the CMCSRDP
  • 393.57 km of roads completed under the CMCSRDP
  • 270 bridges constructed across the state during Chief Minister Khandu's tenure

Sources:

  • (PTI)