Eclipse Automation Secures Multiple Contracts for Nuclear Reactor Refurbishment Projects
Eclipse Automation, part of Accenture, has signed several contracts related to the design, manufacture, and supply of Automated Tooling and Equipment for the upcoming CANDU(R) nuclear reactor refurbishment projects at Cernavoda, Romania and Qinshan, China. The contracts encompass a diverse scope of equipment, including automated inspection tools, radioactive material handling equipment, reactor component retrieval systems, volume reduction systems, state-of-the-art control systems, and an internal remote-control center. This win solidifies Eclipse Automation's position as a trusted and reliable partner to AktinsRealis and other stakeholders in the nuclear industry.
Key Takeaways:
- Eclipse Automation has secured multiple contracts for the design, manufacture, and supply of Automated Tooling and Equipment for CANDU(R) nuclear reactor refurbishment projects at Cernavoda, Romania and Qinshan, China.
- The contracts involve the creation of various equipment, including automated inspection tools, radioactive material handling equipment, and state-of-the-art control systems.
- Steve Mai, CEO of Eclipse Automation, stated that the win further solidifies the company's position as a trusted and reliable partner in the nuclear industry.
- Eclipse Automation has a history of delivering automated solutions and equipment for nuclear refurbishment projects, including the Embalse reactor in Argentina and the Darlington and Bruce nuclear generating stations in Canada.
- Matthew Ross, Senior Vice-President, International Life Extension at Candu Energy Inc., highlighted Eclipse's commitment to safety, quality, schedule, and cost performance, which are critical factors in the successful refurbishment of CANDU(R) reactors globally.
- Eclipse Automation takes an innovative approach by combining proven technology solutions with a deep understanding of nuclear quality requirements, while fostering a strong culture of health and safety.
- A significant portion of Eclipse's work is carried out in Ontario, where their dedicated nuclear team designs, manufactures, and tests specialized nuclear tools and equipment.
- Eclipse's global presence includes facilities in the USA, Europe, and Asia, allowing them to apply local expertise and global insights to solve automation challenges.
Statistics:
- Multiple contracts have been signed for the design, manufacture, and supply of Automated Tooling and Equipment for CANDU(R) nuclear reactor refurbishment projects.
- The contracts involve the creation of various equipment, including automated inspection tools, radioactive material handling equipment, reactor component retrieval systems, volume reduction systems, and state-of-the-art control systems.
- Steve Mai, CEO of Eclipse Automation, emphasized that the win further solidifies the company's position as a trusted and reliable partner in the nuclear industry.
Sources:
- (GLOBE NEWSWIRE via COMTEX) -- CAMBRIDGE, Ontario, June 11, 2025 (GLOBE NEWSWIRE) -- Eclipse Automation, part of Accenture
- (GLOBE NEWSWIRE via COMTEX) -- COMTEX_466281144/2241/2025-06-11T10:57:34 Copyright (C) 2025 GLOBE NEWSWIRE. All rights reserved.