Federal Energy Regulatory Commission Approves PJM Interconnection's Rate Filing
The Federal Energy Regulatory Commission has issued a delegated order approving the ministerial revisions submitted by PJM Interconnection, L.L.C. (PJM) to correct and make consistent certain provisions of the PJM Open Access Transmission Tariff and the Amended and Restated Operating Agreement. The submittal was accepted for filing, effective November 18, 2025, as requested by PJM.
The decision does not constitute approval of any service, rate, charge, classification, or any rule, regulation, contract, or practice affecting such rate or service provided for in the filed document(s). The action is without prejudice to any findings or orders which have been or may hereafter be made by the Commission in any proceeding now pending or hereafter instituted by or against the applicant(s).
Key Takeaways:
- The Federal Energy Regulatory Commission has approved the ministerial revisions submitted by PJM Interconnection, L.L.C. (PJM) to correct and make consistent certain provisions of the PJM Open Access Transmission Tariff and the Amended and Restated Operating Agreement.
- The submittal was accepted for filing, effective November 18, 2025, as requested by PJM.
- Noted sections include OATT Definitions -- A - B (22.0.0), OATT ATTACHMENT DD.5.3A Locational UCAP Bilateral Transactions (6.0.0), and OA SCHEDULE 2 (16.0.0).
- The decision does not constitute approval of any service, rate, charge, classification, or any rule, regulation, contract, or practice affecting such rate or service provided for in the filed document(s).
- The action is without prejudice to any findings or orders which have been or may hereafter be made by the Commission in any proceeding now pending or hereafter instituted by or against the applicant(s).
- The Federal Energy Regulatory Commission has maintained the integrity of regulatory proceedings by not granting approval prior to the review process.
Statistics:
- The submittal was accepted for filing on October 30, 2025.
- The effective date of the delegated order is November 18, 2025.
- The filing was publicly noticed, with no protests or adverse comments filed.
- 16.0.0 (OA SCHEDULE 2) document was filed in this proceeding.
Sources:
- Federal Energy Regulatory Commission, Document Title: FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC 20426 OFFICE OF ENERGY MARKET REGULATION PJM Interconnection, L.L.C., Document No. ER25-3469-000.
- Federal Energy Regulatory Commission, Delegated Order, Docket No. ER25-3469-000, Issued: October 30, 2025.