Federal Energy Regulatory Commission Issues Delegated Order in PJM Interconnection Case

The Federal Energy Regulatory Commission (FERC) has issued a delegated order in the case of PJM Interconnection, L.L.C. (PJM) regarding a Necessary Studies Agreement between PJM and CL-Green Acres LLC. On September 25, 2025, PJM submitted the agreement, which was accepted for filing by the Commission's Director, Division of Electric Power Regulation - East, effective November 25, 2025. The filing was publicly noticed, and no protests or adverse comments were received. The order grants notices of intervention, timely-filed motions to intervene, and unopposed motions to intervene out-of-time filed before the issuance date.

Key Takeaways:

  • The FERC accepted PJM's Necessary Studies Agreement with CL-Green Acres LLC for filing, effective November 25, 2025.
  • The agreement was submitted on September 25, 2025, and was publicly noticed with no protests or adverse comments.
  • The order grants notices of intervention, timely-filed motions to intervene, and unopposed motions to intervene out-of-time filed before the issuance date.
  • This action does not constitute approval of any service, rate, charge, classification, or rule affecting the service or rate provided for in the filed document(s).
  • The order is final agency action, and requests for rehearing may be filed within 30 days of the date of issuance.
  • The order does not recognize any claimed contractual right or obligation affecting or relating to the service or rate.
  • The filing was processed under the direction of Leanne Khammal, Acting Director, Division of Electric Power Regulation - East.

Statistics:

  • Effective date: November 25, 2025
  • Filing date: September 25, 2025
  • Documents accessioned: 20251030-3047 (D LO.docx)
  • PJM Interconnection, L.L.C. provided PJM Service Agreements Tariff, PJM SA No. 7753, PJM SA No. 7753 among PJM and CL-Green Acres (0.0.0).
  • Total filings: 1
  • Number of days for rehearing: 30
  • Regulatory references: 18 C.F.R. SSS 375.307, 385.713, 385.214

Sources:

1. FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC 20426 OFFICE OF ENERGY MARKET REGULATION PJM Interconnection, L.L.C. Docket No. ER25-3510-000 Issued: October 30, 2025

2. PJM Interconnection, L.L.C., PJM Service Agreements Tariff, PJM SA No. 7753, PJM SA No. 7753 among PJM and CL-Green Acres (0.0.0). Document Accession #: 20251030-3047 Filed Date: 10/30/2025 Document Content(s) ER25-3510-000 DLO.docx