FERC Filing: Ohio Power Company Submits Facilities Agreement for Modified Greenwich No. 2 Delivery Point

On May 21, 2025, American Electric Power Service Corporation, on behalf of its affiliates Ohio Power Company and AEP Ohio Transmission Company, Inc., submitted a filing with the Federal Energy Regulatory Commission (FERC) for the approval of a Facilities Agreement between AEP and the Village of Greenwich for the modified Greenwich No. 2 Delivery Point. The agreement outlines engineering, design, equipment procurement, and construction activities for the upgraded delivery point, with an effective date of August 1, 2025.

Key Takeaways:

  • The Facilities Agreement (Greenwich No. 2 FA) is submitted for filing by AEP and Greenwich, with an effective date of May 6, 2025.
  • The agreement supplements the Interconnection and Local Delivery Service Agreement (Greenwich ILDSA) and provides for the upgraded delivery point and performance of certain engineering, design, equipment procurement, and construction activities.
  • The Greenwich No. 2 FA is a child tariff record of the parent ILDSA, which was accepted by FERC effective July 1, 2008, in Docket No. ER08-1150-000.
  • AEP proposes to make a separate filing to update Attachment 1 of the Greenwich ILDSA to reflect changes to delivery point(s) and their related monthly charges.
  • The Commission is requested to grant any and all waivers of FERC's rules and regulations necessary for the acceptance of this filing and the enclosed Agreements.
  • The proposed effective date of August 1, 2025, is more than 60 days from the date of filing, and AEP requests that the Commission waive its rules and regulations accordingly.

Statistics:

  • The Greenwich No. 2 FA was signed on May 6, 2025.
  • The agreement supplements the Interconnection and Local Delivery Service Agreement (Greenwich ILDSA), which was accepted by FERC effective July 1, 2008.
  • The Commission proposes to make a separate filing to update Attachment 1 of the Greenwich ILDSA to reflect changes to delivery point(s) and their related monthly charges.

Sources:

  • Federal Power Act ("FPA"), 16 U.S.C. § 824d(c)
  • Federal Energy Regulatory Commission (FERC) regulations, 18 C.F.R. § 35.13 (2025)
  • American Electric Power Service Corporation, "Filing of the Interconnection and Local Delivery Service Agreement for the Village of Greenwich," Docket No. ER08-1150-000 (July 1, 2008)
  • Village of Greenwich, Interconnection and Local Delivery Service Agreement (Greenwich ILDSA)