FERC Urged to Compel Midship to Work Out Remediation Plan with Landowners and Designate New Compliance Monitor
The Federal Energy Regulatory Commission (FERC) was urged to compel Midship Pipeline Company LLC to work out a remediation plan with landowners affected by the project after a ground inspection revealed numerous issues with buried rock and construction debris. The Commission was also asked to designate a new full-time compliance monitor due to the excessive number of new issues identified since the initial inspections.
Key Takeaways:
- FERC received an Order to Show Cause against Midship on December 16, 2021, requiring the company to file a detailed plan for investigating and removing buried rock and construction debris.
- On June 17-19, 2025, Tetra-Tech performed inspections on properties along the project ROW, but FERC has not yet released the findings or report from these inspections.
- CLC, representatives from Midship, and landowners attended the inspections, but Midship allegedly sought to show FERC's inspectors only what they wanted them to see.
- Since the inspections, a significant number of additional issues have been identified, including new areas of buried construction debris and terrace and drainage issues.
- CLC is submitting photos from a recent ground inspection in Grady County, Oklahoma, as evidence to be addressed by FERC staff.
- The document has been submitted to the public docket, but the link to view the complete document is https://elibrary.ferc.gov.
Statistics:
- The inspection was performed on September 4, 2025.
- The ground inspection was for Will Wheeler (Tract GR-0211.010) in Grady County, Oklahoma.
- The FERC order was submitted on December 16, 2021.
- The Tetra-Tech inspections took place on June 17-19, 2025.
- A new full-time compliance monitor is requested to be designated due to the excessive number of new issues.
Sources:
- Order to Show Cause against Midship Pipeline Company LLC, FERC, December 16, 2021.
- FERC Docket Nos. CP17-458, CP19-17, CLC, September 4, 2025.
- Tetra-Tech inspections report, FERC, June 17-19, 2025 (not yet released).
- CLC inspection report, CLC, September 4, 2025 (submitted to the public docket).