NAVFAC Pacific Issues Solicitation for Shipyard Infrastructure Optimization Program Contracts
NAVFAC Pacific has released a solicitation for a Waterfront Multiple Award Construction Contract primarily for the Shipyard Infrastructure Optimization Program (SIOP) at Hawaii, Washington, and other areas under its cognizance. The contract will provide predominantly construction services for waterfront facilities, including design-bid-build and design-build projects, in support of the SIOP. The main purpose of the contract is to award task orders for military construction projects, including the replacement of Dry Dock 3 at Pearl Harbor Naval Shipyard and the construction of a Multi-Mission Dry Dock at Puget Sound Naval Shipyard.
Key Takeaways:
- The solicitation is for a fixed-price Indefinite-Delivery, Indefinite-Quantity (IDIQ) multiple award construction contract (MACC) with a maximum of five (5) IDIQ MACC contracts to be awarded.
- The contract will cover tasks such as pre-construction planning, constructability reviews, and construction of waterfront facilities, including warehouses, dry docks, piers/wharves, site improvements, dredging, and incidental design, environmental, and services related to the waterfront facilities.
- The NAICS code number for this requirement is 237990.
- The contract will be awarded for the Shipyard Infrastructure Optimization Program (SIOP) at Hawaii, Washington, and other areas under the cognizance of NAVFAC.
- The contracts will support the military construction projects, including the replacement of Dry Dock 3 at Pearl Harbor Naval Shipyard and the construction of a Multi-Mission Dry Dock at Puget Sound Naval Shipyard.
- The contract will be valid for a period of one year from the date of award.
- The solicitation number is N6274221R1345.
- The contact information for the contracting office is 258 Makalapa Dr. Ste. 100, JBBHH, HI 96860-3134, with Chelan N. Crane as the primary point of contact.
Statistics:
- The solicitation number is N6274221R1345.
- The NAICS code number for this requirement is 237990.
- The maximum number of IDIQ MACC contracts to be awarded is five (5).
- The contract will cover tasks such as pre-construction planning, constructability reviews, and construction of waterfront facilities.
- The contract will support military construction projects, including the replacement of Dry Dock 3 at Pearl Harbor Naval Shipyard and the construction of a Multi-Mission Dry Dock at Puget Sound Naval Shipyard.
- The contract will be valid for a period of one year from the date of award.
Sources:
- US Department of Defense Contract Notice, "Waterfront Multiple Award Construction Contract Primarily for the Shipyard Infrastructure Optimization Program at Hawaii, Washington and Other Areas Under the Cognizance of NAVFAC" (Solicitation No: N6274221R1345)