President Museveni Unveils Ambitious Development Plans for Karamoja

President Yoweri Museveni has unveiled an ambitious development plan for Karamoja, a region in Uganda, which includes the construction of an international airport in Kidepo comparable in scale to Entebbe. The plan, which was announced during a public campaign rally, aims to transform the region from a period of hardship to one of progress. The President highlighted the strides made in peace, infrastructure, and social services across the region, citing examples such as the expansion of electricity, road construction, and piped water coverage. He also emphasized the importance of water development, education, and healthcare infrastructure in the region.

Key Takeaways:

  • President Museveni announced plans to construct an international airport in Kidepo, comparable in scale to Entebbe, to be built by private investors.
  • The airport will serve as a hub for tourism, with the President indicating that rich people will come from all over the world to relax and enjoy the region's wildlife.
  • The region's population has grown from 190,000 in 1980 to over 1.5 million, attributed to peace, health, and immunization.
  • The President credited the National Resistance Movement (NRM) politics of unity for bringing peace to the region and avoiding sectarianism.
  • Significant infrastructure milestones in Moroto include the expansion of electricity, road construction, and piped water coverage.
  • The region will also benefit from the construction of water tanks, dams, and irrigation systems, with the President emphasizing the importance of water for production and agriculture.
  • The President outlined plans to establish a government primary school per parish and a secondary school per sub-county, with a total of 16 government primary schools and three secondary schools already in operation.
  • The region will also benefit from the construction of a general referral hospital and Health Centre IIIs, with further upgrades and new facilities underway.

Statistics:

  • The population of Karamoja has grown from 190,000 in 1980 to over 1.5 million.
  • The region has seen a significant increase in electricity coverage, with electricity now stretching from Soroti to Karenga.
  • The Moroto-Kaabong road is being upgraded and tarmacked, and piped water coverage is increasing across villages.
  • The Nadipal Valley Tank has a capacity of 20 million litres and was completed in December 2023.
  • The Nakonyen Valley Dam has a capacity of 1.5 billion litres and is set for completion in November 2025.
  • 11 valley tanks and two wind-powered water systems are already operational, and a solar irrigation system is under construction.
  • The district's education sector serves 21 government primary schools enrolling 16,522 pupils and five government secondary schools with 2,570 students.

Sources:

  • [Nile Post. "President Museveni Unveils Ambitious Development Plans for Karamoja." 2025]