RG&E Station 2 and 26 Hydro Project Deviation Notification

Between September 1 and September 7, 2025, a series of baseflow deviations occurred at the RG&E Station 2 and 26 Hydro Projects due to low flows in the Genesee River and NYSCC's attempts to maintain canal levels. The deviations resulted in reduced baseflow rates, with some instances lasting up to 20 hours and 14 minutes. The Station 2 Project, operated by Rochester Gas & Electric Corporation, was offline during the deviation events, and the company reported no adverse environmental conditions or public inquiries. Similar deviations occurred at the Station 26 Project, with baseflow rates hovering around the minimum during the period.

Key Takeaways:

  • Between September 1 and September 7, 2025, a total of 9 baseflow deviations occurred at the RG&E Station 2 Project, with durations ranging from 6 hours to 20 hours, 14 minutes.
  • The minimum recorded baseflow rate during the deviation period at the Station 2 Project was 318 cfs on September 1, 2025.
  • The Station 26 Project experienced too numerous and too short baseflow deviations between September 1 and September 7, 2025.
  • Most durations of the baseflow deviations at the Station 26 Project lasted 15 minutes or less.
  • The minimum recorded baseflow rate during the deviation period at the Station 26 Project was 255 cfs.
  • Both projects were offline during the deviation events, and no adverse environmental conditions or public inquiries were reported.
  • RG&E has confirmed that the deviations were caused by low flows in the Genesee River and NYSCC's attempts to maintain canal levels.

Statistics:

  • Total number of baseflow deviations at the RG&E Station 2 Project: 9
  • Total duration of baseflow deviations at the RG&E Station 2 Project: 72 hours, 32 minutes
  • Minimum recorded baseflow rate at the RG&E Station 2 Project: 318 cfs
  • Total number of baseflow deviations at the RG&E Station 26 Project: too numerous to list
  • Most durations of baseflow deviations at the RG&E Station 26 Project: 15 minutes or less
  • Minimum recorded baseflow rate at the RG&E Station 26 Project: 255 cfs

Sources:

  • Rochester Gas & Electric Corporation to Honorable Debbie-Anne A. Reese, Secretary Federal Energy Regulatory Commission, 2025
  • ORDER ISSUING NEW LICENSE, issued February 22, 1996, for the Station 2 Project
  • ORDER ISSUING NEW LICENSE, issued October 17, 1997, for the Station 26 Project
  • FERC Project No. P-2582-NY, RG&E Station 2 Hydro Project FERC Project No. P-2584-NY, RG&E Station 26 Hydro Project Notification of Deviations between September 1, 2025 and September 7, 2025