Union of Concerned Scientists Seeks Intervention in Energy Regulatory Proceeding

The Union of Concerned Scientists (UCS) has submitted a motion to intervene in a Federal Energy Regulatory Commission (FERC) proceeding, citing concerns over the allocation of costs associated with the operation of the J.H. Campbell plant. As a national public interest organization, UCS advocates for science-based policies, including responsible energy policy and utility oversight. With members and supporters across the country, UCS is headquartered in Cambridge, Massachusetts, and has offices in Washington, DC; Berkeley, California; and Chicago, Illinois.

Key Takeaways:

  • The Union of Concerned Scientists (UCS) has submitted a motion to intervene in the FERC proceeding EL25-90-000, citing concerns over the allocation of costs associated with the operation of the J.H. Campbell plant.
  • UCS is a national public interest organization that advocates for science-based policies, including responsible energy policy and utility oversight.
  • UCS has members and supporters throughout the country and is headquartered in Cambridge, Massachusetts, with additional offices in Washington, DC; Berkeley, California; and Chicago, Illinois.
  • UCS is seeking intervention in the proceeding to ensure its interests are represented, as they believe they are not adequately represented by any other party.
  • The estimated total document content is 1 page with 1 document accessed on 20250620.

Statistics:

  • 1 document accessed on 20250620
  • 1 page with document content on 20250620
  • 1635233_Interv.txt is the document name
  • 1 document accession number 20250620-5058

Sources:

  • Union of Concerned Scientists (UCS) motion to intervene in FERC proceeding EL25-90-000, dated 6/20/2025
  • Federal Energy Regulatory Commission (FERC) proceeding EL25-90-000
  • Department of Energy
  • State regulatory authorities