Union of Concerned Scientists Seeks Intervention in Energy Regulatory Proceeding
The Union of Concerned Scientists (UCS) has submitted a motion to intervene in a Federal Energy Regulatory Commission (FERC) proceeding, citing concerns over the allocation of costs associated with the operation of the J.H. Campbell plant. As a national public interest organization, UCS advocates for science-based policies, including responsible energy policy and utility oversight. With members and supporters across the country, UCS is headquartered in Cambridge, Massachusetts, and has offices in Washington, DC; Berkeley, California; and Chicago, Illinois.
Key Takeaways:
- The Union of Concerned Scientists (UCS) has submitted a motion to intervene in the FERC proceeding EL25-90-000, citing concerns over the allocation of costs associated with the operation of the J.H. Campbell plant.
- UCS is a national public interest organization that advocates for science-based policies, including responsible energy policy and utility oversight.
- UCS has members and supporters throughout the country and is headquartered in Cambridge, Massachusetts, with additional offices in Washington, DC; Berkeley, California; and Chicago, Illinois.
- UCS is seeking intervention in the proceeding to ensure its interests are represented, as they believe they are not adequately represented by any other party.
- The estimated total document content is 1 page with 1 document accessed on 20250620.
Statistics:
- 1 document accessed on 20250620
- 1 page with document content on 20250620
- 1635233_Interv.txt is the document name
- 1 document accession number 20250620-5058
Sources:
- Union of Concerned Scientists (UCS) motion to intervene in FERC proceeding EL25-90-000, dated 6/20/2025
- Federal Energy Regulatory Commission (FERC) proceeding EL25-90-000
- Department of Energy
- State regulatory authorities