Vermont Public Utility Commission Rejects Initial Decommissioning Fund Letter of Credit for Bristol Solar, LLC
The Vermont Public Utility Commission has rejected the initial decommissioning fund letter of credit filed by Bristol Solar, LLC, as part of its approval for a 2.2 MW photovoltaic electric generation facility in Bristol, Vermont. The commission found that the letter of credit did not comply with its requirements, specifically lacking a drawing certificate. The CPG Holder, Bristol Solar, LLC, has been encouraged to consult the commission's website for further guidance on filing a letter of credit and is required to file a revised letter of credit by May 26, 2023.
Key Takeaways:
- The Vermont Public Utility Commission has rejected the initial decommissioning fund letter of credit filed by Bristol Solar, LLC due to non-compliance with its requirements.
- The letter of credit lacked a drawing certificate, which is a critical component of the commission's requirements.
- Bristol Solar, LLC has been encouraged to consult the commission's website for guidance on filing a letter of credit, including a sample letter of credit and drawing certificate.
- The CPG Holder has been required to file a revised letter of credit by May 26, 2023.
- The commission's order and certificate of public good (CPG) for the Bristol Solar, LLC project was issued on September 20, 2021.
- The project involves a 2.2 MW photovoltaic electric generation facility in Bristol, Vermont.
- The commission's requirements for letters of credit are posted on its website, including a sample letter of credit and drawing certificate.
Statistics:
- 2.2 MW: The capacity of the photovoltaic electric generation facility approved for Bristol Solar, LLC.
- 30 V.S.A. § 248: The Vermont statute under which the Vermont Public Utility Commission has issued its order and certificate of public good (CPG)
- 30 days: The remaining time before expiration of the letter of credit, as required by the commission's requirements.
- 9/20/21: The date on which the commission issued its order and certificate of public good (CPG) for the Bristol Solar, LLC project.
- 3/27/23: The date on which the CPG Holder filed the initial letter of credit with the commission.
- 5/26/23: The date by which the CPG Holder must file a revised letter of credit.
Sources:
- Vermont Public Utility Commission, Order REJECTING INITIAL DECOMMISSIONING FUND LETTER OF CREDIT, Case No. 21-0974-PET (April 26, 2023).